Robertson/Hurlbutt/Wallan Tanks Replacement Project
Preliminary Engineering Report June 2023
GSD-WATER-IMPROVMTS-PER-FINAL 2023.pdfEngineering Geologic and Geotechnical Investigation Report August 2023
20231030-GSDGeotechReport-Rev1 update 12-14-23.pdf60% Project Plans October 2023
GARBERVILLE-WATER-60-PERCENT-Web.pdfEnvironmental Documents (CEQA)
The District is curculating a Draft Initial Study/Proposed Mitigated Negative Declaration (Draft IS/MND) for the Tanks Replacement Project.
The public comment period ends on November 24, 2023 at 5:00 pm. Written comments can be emailed to jmshort@garbervillesd.org, or mailed to the Attention of Jennie Short, Project Manager, Gaberville Sanitary District, P.O. Box 211, Garberville CA 95542.
The documents can be downloaded from the links below:
~ Notice of Completion & Environmental Document Transmittal
NOC-17Oct2023_signed-.pdf.pdf~ Notice of Availability of Draft IS/MND
NOA-NOI_GSD-Tanks_Draft IS-MND_18Oct2023.pdf~ Draft IS/MND Document - October 2023
20231019-Public-Draft-IS-MND-GSD.pdf~ Draft Mitigation Monitoring and Reporting Program October 2023
CEQA MMRP_GSD Water Tanks Project_10-17-23.pdf~ Biological and Wetland Assessment October 2023
20231009-BioAssmt-Rev1_r.pdf~ Final IS/MND Robertson/Wallan/Hurlbutt Ranks Replacement Project
20231213-Final-IS-MND-GSD_r_SIGNED website copy LS 12-21-23.pdfNOD signed 2023 1219 website copy LS 12-21-2023.pdfResolution 23-015 Signed website copy LS 12-21-23.pdf